CAT A
Landlord's base-build finish — raised floor, suspended ceiling, perimeter heating/cooling, emergency lighting. Ready for tenant to fit out.
CAT A+
CAT A plus meeting rooms, kitchen, paint, carpet and basic furniture. Occupier-ready without further fit-out. Landlord-provided.
CAT B
Full tenant fit-out — partitioning, branded reception, kitchens, AV, specialist lighting, bespoke finishes. Commissioned by the occupier.
Dilapidations
Tenant's lease-end obligation to reinstate the demise to the condition specified in the lease.
Schedule of dilapidations
Landlord surveyor's itemised list of reinstatement works required at lease exit.
Scott schedule
Four-column document format for dilapidations: tenant items, tenant comments, landlord response, surveyor determination.
Pre-action Protocol
Ministry of Justice protocol governing conduct between parties in a dilapidations dispute before litigation.
Section 18(1)
Landlord and Tenant Act 1927 clause capping dilapidations at the diminution in value of the landlord's reversion.
Licence to alter
Formal landlord consent required for tenant-initiated alterations to the demise.
LTA
Abbreviation for Licence to Alter.
CDM 2015
Construction (Design and Management) Regulations 2015 — UK health and safety regulations for construction projects.
Principal contractor
CDM 2015 role — plans, manages and monitors the construction phase.
Principal designer
CDM 2015 role — plans, manages and monitors the pre-construction phase.
F10
HSE form notifying a construction project. Required for projects over 500 person-days or 30 days with 20+ simultaneous workers.
FIRAS
Fire Installation Resistance Accreditation Scheme — third-party certification for fire-stopping installers. Run by Warringtonfire.
Fire-stopping
Material sealing service penetrations through fire compartments to maintain compartment fire rating.
Compartment rating
Fire resistance of a wall, floor or ceiling in minutes (30, 60, 90) — time it holds fire containment.
NICEIC
National Inspection Council for Electrical Installation Contracting — electrical competence scheme.
EICR
Electrical Installation Condition Report — periodic inspection of fixed electrical installation per BS 7671.
BS 7671
British Standard for electrical installation — the 'Wiring Regs'.
BS 5266
British Standard for emergency lighting.
Rw
Weighted sound reduction index — single-number acoustic performance rating for partitions and ceilings.
NRC
Noise Reduction Coefficient — how much sound a surface absorbs. Higher = more absorption.
Part E
Building Regulations section on resistance to sound passage.
Part B
Building Regulations section on fire safety.
Part L
Building Regulations section on energy performance.
Part M
Building Regulations section on accessibility and inclusive design.
L8
HSE Approved Code of Practice for Legionella control in water systems.
F-Gas
Regulations governing fluorinated greenhouse gases in refrigeration and HVAC systems.
PPM
Planned Preventative Maintenance — programmed maintenance schedule against asset register.
CAFM
Computer-Aided Facility Management — software for managing FM operations.
FIRAS certificate
Documentary evidence of fire-stopping installation to third-party certified standard.
Slab-to-slab partition
Partition running from structural slab below to structural slab above — maintaining acoustic and fire performance.
Demountable partition
Partition system designed for removal and reconfiguration without damage to the fabric.
O&M manual
Operation and Maintenance manual — handover document describing built systems for ongoing management.
H&S file
Health and Safety file — CDM 2015 record of the project preserved for the life of the building.
Golden thread
Building Safety Act 2022 concept — the digital record of information required for a high-risk building.
CAT B premium
High-spec tenant fit-out with bespoke finishes, premium materials and architectural commission (£220+ per sqft).
Trophy tower
London market term for the highest-value Grade A office towers (e.g. 22 Bishopsgate, Shard, 1 Canada Square).
Managing agent
Property management firm engaged by the landlord to manage the building — Savills, CBRE, JLL etc.
Rent-free period
Incentive granted to tenants at lease commencement — typically equates to CAT B contribution.
Service charge
Landlord-recovered costs for maintaining the building's common parts and plant.
MEES
Minimum Energy Efficiency Standards — regulations requiring EPC rating E or better to let commercial property.