Commercial office services across the Canary Wharf estate (E14). We are an approved contractor on the Canary Wharf Group (CWG) estate, operating under CWG's strict loading, out-of-hours and CDM protocols, and holding all required insurance and compliance records on file with the CWG tenant services team.
Canary Wharf is the secondary London financial district — 16m+ sqft across trophy towers (One Canada Square, 25 Canada Square, 40 Bank Street, 25 Bank Street) and peripheral Grade A blocks in Wood Wharf and the North Quay. Occupiers are dominated by banking, asset management, law, and increasingly life-sciences (Cherry Park) and tech.
Reference list available on request under NDA.
Works within the CWG estate are governed by the CWG fit-out guide — contractor approvals, permit-to-work regime, and CWG-specific fire, lift and loading protocols. Wood Wharf and Cherry Park developments have additional developer-specific requirements. LBS-level planning largely doesn't apply on the estate.
CWG mandates strict loading windows (typically 6am–9am and 6pm–10pm for construction traffic) and prohibits heavy noise works during trading hours on most buildings. Out-of-hours working is the norm for occupied fit-out and dilapidations.
All loading is pre-booked through CWG tenant services — typical lead time 48–72 hours. Vehicles enter via the estate's service road network; skips are not permitted on the estate — waste is removed daily via enclosed trucks.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
End-of-lease dilapidations works to settle schedules of dilapidations quickly and compliantly.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
Whole-building commercial maintenance for multi-let, retail, hospitality and mixed-use assets.
Fabric, flooring, ceiling, joinery, paint and minor M&E repairs — attended and completed under one PM.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Yes. We hold up-to-date approvals with Canary Wharf Group tenant services, including CSCS, insurance, CDM competence, and the CWG-specific fit-out protocol sign-off.
CWG operates the tightest loading regime in London — windows are pre-booked 48–72 hours ahead, skips are prohibited, and all waste leaves in enclosed trucks. We plan the logistics strategy from day one.
Only silent works. All heavy noise, impact and chasing works are confined to out-of-hours (6pm–6am) shifts. Dust-sealed segregation and HEPA extract are mandatory on CWG occupied floors.
Yes — our PM manages the permit regime daily including hot works, working at height, live electrical, and confined space permits against the CWG framework.
8,000 sqft: 10–12 weeks. 18,000 sqft: 16–20 weeks. 30,000+ sqft: 20–26 weeks. Add 1–2 weeks for CWG mobilisation approvals.
Canary Wharf (Jubilee + Elizabeth line), Heron Quays (DLR), South Quay, Canary Wharf Pier (Thames Clippers). Elizabeth line opening has materially reduced commute times from west London.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10.