Commercial office services across Liverpool Street, Bishopsgate and Broadgate (EC2, EC3). We hold approved contractor status on the Broadgate estate and operate under British Land / GIC's permit-to-work regime across the 32-acre campus.
The Broadgate-to-Bishopsgate corridor is one of London's highest-value commercial clusters — 22 Bishopsgate (the tallest in the Square Mile), the full Broadgate estate (13 buildings, 4m sqft), and the Shoreditch edge. Occupiers span banking, insurance, law, tech and media.
Reference list available on request under NDA.
Broadgate estate works engage British Land's approved contractor scheme and internal fit-out guide. City of London Corporation holds planning authority for most of EC2/EC3. Conservation areas at Broad Street, Bishopsgate Goodsyard and Spitalfields add overlay.
Broadgate strict out-of-hours loading: 6am–8am and 6pm–10pm for construction traffic. Trading hours on investment-banking floors (6:30am market opening) compress feasible heavy-noise windows — most work is 7pm–5am.
Broadgate loading is booked 72 hours ahead via estate management. Skips prohibited on the estate — waste removed in enclosed trucks nightly. ULEZ compliance mandatory for all vehicles.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
End-of-lease dilapidations works to settle schedules of dilapidations quickly and compliantly.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Demountable, acoustic and glazed partitioning for meeting rooms, offices and open-plan subdivision.
Whole-building commercial maintenance for multi-let, retail, hospitality and mixed-use assets.
Fabric, flooring, ceiling, joinery, paint and minor M&E repairs — attended and completed under one PM.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Yes — we hold up-to-date British Land approvals including CSCS, insurance, CDM and Broadgate-specific fit-out protocol sign-off.
6am–8am and 6pm–10pm for construction traffic. Heavy-noise works in 22 Bishopsgate and Broadgate trophy buildings only 8pm–5am. We plan the programme around these windows from day one.
Yes. Live trading-floor refurbishments are delivered in phased night shifts 8pm–5am with full dust-sealed segregation, low-noise tools, and completion of reinstatement before 6:30am market open.
10,000 sqft: 12–14 weeks. 25,000 sqft (full floor): 18–22 weeks. 100,000 sqft (multi-floor trophy): 32–40 weeks phased.
Liverpool Street (Elizabeth line, Central, Circle, Metropolitan, Hammersmith & City + National Rail + Stansted Express), Moorgate (Elizabeth line, Northern), Bank (Central, Northern, Waterloo & City, DLR).
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10.