Office Renovation delivered in Liverpool Street & Bishopsgate, London EC2, EC3
Liverpool Street & Bishopsgate · Office Renovation

Office Renovation in Liverpool Street & Bishopsgate

Office Renovation across Liverpool Street & Bishopsgate (EC2, EC3). Office renovation — modernising existing space without a full strip-out and re-fit. Targeted upgrades to layout, finishes, lighting and M&E, delivered while teams remain in occupation.

Estate-approvedCDM 2015FIRASNICEIC£10M insured

Office Renovation in Liverpool Street & Bishopsgate — what businesses typically need

Office Renovation across Liverpool Street & Bishopsgate (EC2, EC3) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 22 Bishopsgate, 100 Liverpool Street, 1 Appold Street, 5 Broadgate, 201 Bishopsgate among others. Teams mobilise from our London operations base, with direct transport links via Liverpool Street (Elizabeth line, Central, Circle, Metropolitan, Hammersmith & City + National Rail + Stansted Express), Moorgate (Elizabeth line, Northern), Bank (Central, Northern, Waterloo & City, DLR). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.

The Liverpool Street & Bishopsgate market is dominated by global investment banks (ubs, deutsche bank), law firms (herbert smith freehills, reed smith), insurance and reinsurance, each with distinct office renovation requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office renovation in trophy buildings including 22 Bishopsgate, 100 Liverpool Street, 1 Appold Street, 5 Broadgate.

The Broadgate-to-Bishopsgate corridor is one of London's highest-value commercial clusters — 22 Bishopsgate (the tallest in the Square Mile), the full Broadgate estate (13 buildings, 4m sqft), and the Shoreditch edge. Occupiers span banking, insurance, law, tech and media.

Our commercial delivery model

Broadgate strict out-of-hours loading: 6am–8am and 6pm–10pm for construction traffic. Trading hours on investment-banking floors (6:30am market opening) compress feasible heavy-noise windows — most work is 7pm–5am. Broadgate loading is booked 72 hours ahead via estate management. Skips prohibited on the estate — waste removed in enclosed trucks nightly. ULEZ compliance mandatory for all vehicles.

  1. Stage 1

    Condition survey and renovation brief workshop

  2. Stage 2

    Priced option pack — 'good / better / best' against budget

  3. Stage 3

    Phased delivery across 2–5 zones

  4. Stage 4

    Nightly dust-sealed segregation and air quality control

  5. Stage 5

    Floor-by-floor handover with snagging close-out

Programme, budget, and disruption

TierRangeWhat's covered
Cosmetic refresh£30–£55 per sqftPaint, carpet, lighting, signage
Targeted renovation£55–£95 per sqftPartitioning adjustments, lighting upgrade, breakout zones
Full renovation£95–£160 per sqftNew M&E, partitioning, tea points, meeting rooms

This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.

Typical works we deliver in Liverpool Street & Bishopsgate

Cosmetic refresh — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Lighting upgrade — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Partitioning adjustments — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Acoustic treatment — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Flooring replacement — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Redecoration — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Tea point refresh — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Breakout zones — delivered in Liverpool Street & Bishopsgate under estate-approved loading and out-of-hours protocols.

Planning and compliance for Office Renovation in Liverpool Street & Bishopsgate

Broadgate estate works engage British Land's approved contractor scheme and internal fit-out guide. City of London Corporation holds planning authority for most of EC2/EC3. Conservation areas at Broad Street, Bishopsgate Goodsyard and Spitalfields add overlay.

Service-specific compliance

CDM 2015 principal contractor (on larger works)FIRAS fire-stopping where compartments affectedNICEIC electricalPart B, Part E, Part M where works triggerBS 5266 emergency lighting£10M PL + £10M PI

Buildings we have worked in across Liverpool Street & Bishopsgate

Notable buildings

  • 22 Bishopsgate
  • 100 Liverpool Street
  • 1 Appold Street
  • 5 Broadgate
  • 201 Bishopsgate
  • Broadgate Tower
  • 155 Bishopsgate
  • 1 Finsbury Avenue
  • 2 Finsbury Avenue
  • 8 Bishopsgate
  • Exchange House
  • Alphabeta Building

Notable estates

  • Broadgate Estate (British Land / GIC)
  • Broadgate Circle campus
  • Bishopsgate Goodsyard (development zone)

Reference list available on request under NDA.

Our process — seven stages

  1. Survey

    Measured condition survey within 5 working days, including M&E, fabric and compliance review.

  2. Brief

    Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.

  3. Design

    Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.

  4. Fixed quote

    Lump-sum price against the design package. All prelims transparent.

  5. Mobilisation

    CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.

  6. Delivery

    Weekly client reports with photos, programme RAG, variation log, compliance status.

  7. Handover

    O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.

Office Renovation specifications by building type

Trophy towers (25,000–30,000 sqft plates)

Office Renovation in trophy towers (25,000–30,000 sqft plates) is typically specified to cosmetic refresh level — paint, carpet, lighting, signage. Programme is governed by loading access and estate working-hours framework.

Broadgate campus Grade A (15,000–22,000 sqft plates)

Office Renovation in broadgate campus grade a (15,000–22,000 sqft plates) is typically specified to targeted renovation level — partitioning adjustments, lighting upgrade, breakout zones. Programme is governed by loading access and estate working-hours framework.

Period refurbished stock

Office Renovation in period refurbished stock is typically specified to full renovation level — new m&e, partitioning, tea points, meeting rooms. Programme is governed by loading access and estate working-hours framework.

Listed Liverpool Street station-adjacent buildings

Office Renovation in listed liverpool street station-adjacent buildings is typically specified to full renovation level — new m&e, partitioning, tea points, meeting rooms. Programme is governed by loading access and estate working-hours framework.

Out-of-hours, weekend, and live-environment working

Renovation under occupancy is typically delivered as phased zones, with dust-sealed hoarding and night-shift for noise-generating works (demolition, chasing, drilling). A typical floor renovation runs 4–8 weeks with staff remaining in other zones.

Broadgate strict out-of-hours loading: 6am–8am and 6pm–10pm for construction traffic. Trading hours on investment-banking floors (6:30am market opening) compress feasible heavy-noise windows — most work is 7pm–5am. Broadgate loading is booked 72 hours ahead via estate management. Skips prohibited on the estate — waste removed in enclosed trucks nightly. ULEZ compliance mandatory for all vehicles.

Planned preventative maintenance (PPM)

All Liverpool Street & Bishopsgate occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Liverpool Street & Bishopsgate see Office Maintenance in Liverpool Street & Bishopsgate or Commercial Maintenance in Liverpool Street & Bishopsgate.

Case studies

Anonymised project outlines from our Liverpool Street & Bishopsgate and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.

Heritage building renovation

Scope · 7,200 sqft

Budget band · £380k

Programme · 8 weeks

Lighting, acoustic treatment, meeting rooms, breakout

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Tech occupier refresh

Scope · 5,400 sqft

Budget band · £215k

Programme · 5 weeks

Cosmetic refresh with branded signage and biophilic walls

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Law firm targeted renovation

Scope · 9,800 sqft

Budget band · £520k

Programme · 10 weeks

Partitioning adjustments, new client suite, M&E upgrades

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

FAQs — Office Renovation in Liverpool Street & Bishopsgate

What's the difference between renovation and refurbishment?

Renovation is targeted modernisation without full strip-out — it reuses sound elements and focuses on impact. Refurbishment is a broader scope, typically including M&E alterations and partitioning. Fit-out replaces everything to let-ready or occupier-ready standard.

How much disruption should we expect?

With phased zoning and night-shift for noisy works, typical disruption is limited to temporary relocation within the same floor. A 10,000 sqft renovation over 3 phases runs 8–12 weeks with no staff displacement.

Is renovation cheaper than full refurbishment?

Typically 30–50% cheaper per sqft because you retain sound ceilings, floor plates and core M&E. The trade-off is that the layout is constrained by existing infrastructure.

Are you approved on the Broadgate estate?

Yes — we hold up-to-date British Land approvals including CSCS, insurance, CDM and Broadgate-specific fit-out protocol sign-off.

How strict are the out-of-hours windows?

6am–8am and 6pm–10pm for construction traffic. Heavy-noise works in 22 Bishopsgate and Broadgate trophy buildings only 8pm–5am. We plan the programme around these windows from day one.

Can you deliver while trading floors are live?

Yes. Live trading-floor refurbishments are delivered in phased night shifts 8pm–5am with full dust-sealed segregation, low-noise tools, and completion of reinstatement before 6:30am market open.

What's a typical Broadgate CAT B programme?

10,000 sqft: 12–14 weeks. 25,000 sqft (full floor): 18–22 weeks. 100,000 sqft (multi-floor trophy): 32–40 weeks phased.

Related services in Liverpool Street & Bishopsgate

Related insights

In-depth articles on commercial fit-out, compliance and market strategy.

Start with a survey in Liverpool Street & Bishopsgate

Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.