Full-service office refurbishment for occupied and vacant London commercial space. We deliver CAT B fit-outs, M&E upgrades, partitioning, flooring, decorating and lighting under a single fixed-price contract, with a named project manager and principal contractor duties under CDM 2015.
Measured survey and condition report within 5 working days
Space plan and CAT B design brief in 2 weeks
Fixed-price quote with CAT A dilapidations split
Principal contractor appointment under CDM 2015
Mobilisation with agreed DSEAR, RAMS and induction pack
Weekly programme reports to landlord and managing agent
Handover with O&M manuals, as-built drawings and building control sign-off
| Tier | Range | What's covered |
|---|---|---|
| Light refresh | £45–£75 per sqft | Paint, carpet, light fittings, minor partitioning |
| Standard CAT B | £85–£140 per sqft | New partitioning, flooring, M&E alterations, joinery, full redecoration |
| High-spec CAT B | £160–£250 per sqft | Bespoke joinery, specialist lighting, VRF upgrade, executive suites |
| Trophy / HQ | £275–£400+ per sqft | Architectural feature work, marble, timber, audio-visual, wellness spaces |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
We deliver refurbishment works in live offices through phased 6pm–6am night shifts and weekend programmes. Dust-sealed segregation with negative-pressure extract, scent-neutral paint systems and noise planning co-ordinated with the managing agent. Out-of-hours staff are CSCS-inducted and attend the building's specific permit-to-work and fire evacuation briefings.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · 12,000 sqft
Budget band · £1.6M
Programme · 14 weeks
Full CAT B including executive suite, trading floor, client meeting rooms
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 7,500 sqft
Budget band · £620k
Programme · 9 weeks
Partitioning, flooring, LED lighting upgrade, redecoration
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4,200 sqft
Budget band · £310k
Programme · 6 weeks
Open plan redesign, acoustic treatment, tea point and meeting rooms
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes. We phase refurbishment into occupied and decanted zones, with physical hoarding, air-sealed segregation, and noise-generating works confined to out-of-hours shifts. A typical floor plate can be refurbished in 2–3 phases over 8–14 weeks.
We price fixed lump-sum against an agreed scope. Any variations are priced per item with a written instruction before works proceed. No open-book percentage markups.
Yes. Where a lease requires CAT A reinstatement on exit, we split the quote between permanent CAT B works and end-of-lease reinstatement, so you can plan the dilapidations liability from day one.
10-year structural warranty where applicable; 2 years on M&E alterations; manufacturer warranties on finishes, carpet, flooring and light fittings passed through to the client.
Yes — £10M public liability and £10M professional indemnity. Full cover for works in managed estates including Broadgate, Canary Wharf Group, Great Portland Estates and Grosvenor.
Yes. Our project manager liaises with the managing agent and landlord's surveyor throughout, including drawings, M&E schedules, and dilapidations undertakings.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.