Office Partitioning across Canary Wharf (E14). Office partitioning — demountable, acoustic, full-height glazed and solid-core systems. Installed under occupancy or during refurbishment, with Part E acoustic compliance and FIRAS fire-stopping certification.
Office Partitioning across Canary Wharf (E14) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to One Canada Square, 25 Canada Square (Citi), 8 Canada Square (HSBC), 40 Bank Street, 25 Bank Street (JPMorgan) among others. Teams mobilise from our London operations base, with direct transport links via Canary Wharf (Jubilee + Elizabeth line), Heron Quays (DLR), South Quay, Canary Wharf Pier (Thames Clippers). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Canary Wharf market is dominated by global investment banks (hsbc, citi, jpmorgan, barclays), magic-circle and silver-circle law firms, asset and wealth management, each with distinct office partitioning requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office partitioning in trophy buildings including One Canada Square, 25 Canada Square (Citi), 8 Canada Square (HSBC), 40 Bank Street.
Canary Wharf is the secondary London financial district — 16m+ sqft across trophy towers (One Canada Square, 25 Canada Square, 40 Bank Street, 25 Bank Street) and peripheral Grade A blocks in Wood Wharf and the North Quay. Occupiers are dominated by banking, asset management, law, and increasingly life-sciences (Cherry Park) and tech.
CWG mandates strict loading windows (typically 6am–9am and 6pm–10pm for construction traffic) and prohibits heavy noise works during trading hours on most buildings. Out-of-hours working is the norm for occupied fit-out and dilapidations. All loading is pre-booked through CWG tenant services — typical lead time 48–72 hours. Vehicles enter via the estate's service road network; skips are not permitted on the estate — waste is removed daily via enclosed trucks.
Site survey and dimensional check — 48 hours
Partition and glazing specification with acoustic Rw rating
Off-site fabrication to reduce on-site dust and time
Night or weekend installation for occupied floors
Part E acoustic test report on request
| Tier | Range | What's covered |
|---|---|---|
| Demountable solid | £140–£240 per linear metre | Plasterboard face, steel studwork, Rw 42–48 |
| Single-glazed frameless | £380–£550 per linear metre | 10–12mm glass, minimal frame, Rw 35–42 |
| Double-glazed acoustic | £650–£900 per linear metre | 10+12mm glass, cavity, Rw 45–52 |
| Executive timber + glazed | £900+ per linear metre | Bespoke veneers, integrated blinds, Rw 48+ |
City, Canary Wharf and prime Westminster carry a typical 10–20% premium over outer London zones due to loading restrictions, out-of-hours working and estate-approval overheads. Figures are guide ranges — we provide a fixed quote after survey.
Demountable solid — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Single-glazed — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Double-glazed acoustic — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Executive timber — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Manifestation — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Integrated blinds — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Door sets — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Fire-stopping — delivered in Canary Wharf under estate-approved loading and out-of-hours protocols.
Works within the CWG estate are governed by the CWG fit-out guide — contractor approvals, permit-to-work regime, and CWG-specific fire, lift and loading protocols. Wood Wharf and Cherry Park developments have additional developer-specific requirements. LBS-level planning largely doesn't apply on the estate.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Office Partitioning in trophy tower grade a (20,000–30,000 sqft floor plates) is typically specified to demountable solid level — plasterboard face, steel studwork, rw 42–48. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in mid-tier cwg blocks (10,000–15,000 sqft plates) is typically specified to single-glazed frameless level — 10–12mm glass, minimal frame, rw 35–42. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in new-build wood wharf residential + office hybrids is typically specified to double-glazed acoustic level — 10+12mm glass, cavity, rw 45–52. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in life-sciences labs (cherry park) is typically specified to executive timber + glazed level — bespoke veneers, integrated blinds, rw 48+. Programme is governed by loading access and estate working-hours framework.
Partition installation is commonly delivered as night-shift work in occupied offices — off-site fabrication reduces on-site time to under 2 hours per metre installed. Dust barriers, HEPA vacuum and scent-neutral silicones are standard.
CWG mandates strict loading windows (typically 6am–9am and 6pm–10pm for construction traffic) and prohibits heavy noise works during trading hours on most buildings. Out-of-hours working is the norm for occupied fit-out and dilapidations. All loading is pre-booked through CWG tenant services — typical lead time 48–72 hours. Vehicles enter via the estate's service road network; skips are not permitted on the estate — waste is removed daily via enclosed trucks.
All Canary Wharf occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Canary Wharf see Office Maintenance in Canary Wharf or Commercial Maintenance in Canary Wharf.
Anonymised project outlines from our Canary Wharf and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 12 rooms
Budget band · £180k
Programme · 3 weeks
Double-glazed acoustic, integrated blinds, manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 8 pods
Budget band · £95k
Programme · 2 weeks
Frameless glazed with branded manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 offices
Budget band · £125k
Programme · 2 weeks
Timber and glazed hybrid with integrated AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — off-site fabrication means each linear metre installs in under 2 hours, so a typical meeting-room suite is completed over 2–3 night shifts.
Single-glazed Rw 35–42; double-glazed Rw 45–52; solid demountable Rw 42–48; bespoke systems Rw 55+. Independent Part E test reports on request.
Yes — EI30 and EI60 glazed fire screens are available where compartmentation requires them, with FIRAS-certified installation.
Demountable systems are specifically designed for reconfiguration without damaging ceiling, floor or walls. Typical reconfigure time is 1–2 days per meeting room.
Yes. We hold up-to-date approvals with Canary Wharf Group tenant services, including CSCS, insurance, CDM competence, and the CWG-specific fit-out protocol sign-off.
CWG operates the tightest loading regime in London — windows are pre-booked 48–72 hours ahead, skips are prohibited, and all waste leaves in enclosed trucks. We plan the logistics strategy from day one.
Only silent works. All heavy noise, impact and chasing works are confined to out-of-hours (6pm–6am) shifts. Dust-sealed segregation and HEPA extract are mandatory on CWG occupied floors.
Yes — our PM manages the permit regime daily including hot works, working at height, live electrical, and confined space permits against the CWG framework.
8,000 sqft: 10–12 weeks. 18,000 sqft: 16–20 weeks. 30,000+ sqft: 20–26 weeks. Add 1–2 weeks for CWG mobilisation approvals.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
Whole-building decorating for commercial occupiers. Night and weekend delivery.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.