Office Partitioning across King's Cross (N1C). Office partitioning — demountable, acoustic, full-height glazed and solid-core systems. Installed under occupancy or during refurbishment, with Part E acoustic compliance and FIRAS fire-stopping certification.
Office Partitioning across King's Cross (N1C) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square, R7 (Meta) among others. Teams mobilise from our London operations base, with direct transport links via King's Cross St Pancras (Victoria, Piccadilly, Northern, Circle, Metropolitan, Hammersmith & City + National Rail + Eurostar), Farringdon (Elizabeth line — 1 stop), Euston (Victoria, Northern + National Rail). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The King's Cross market is dominated by tech giants (google, meta, deepmind, astrazeneca r&d), media (guardian, universal music, havas), creative (central saint martins, design studios), each with distinct office partitioning requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office partitioning in trophy buildings including 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square.
King's Cross estate spans from the Regent's Canal to Euston Road, with anchor HQ buildings, Granary Square, Coal Drops Yard retail and the Saint Pancras International corridor. Occupiers are heavily weighted to tech, media, creative industries and education (UAL Central Saint Martins).
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
Site survey and dimensional check — 48 hours
Partition and glazing specification with acoustic Rw rating
Off-site fabrication to reduce on-site dust and time
Night or weekend installation for occupied floors
Part E acoustic test report on request
| Tier | Range | What's covered |
|---|---|---|
| Demountable solid | £140–£240 per linear metre | Plasterboard face, steel studwork, Rw 42–48 |
| Single-glazed frameless | £380–£550 per linear metre | 10–12mm glass, minimal frame, Rw 35–42 |
| Double-glazed acoustic | £650–£900 per linear metre | 10+12mm glass, cavity, Rw 45–52 |
| Executive timber + glazed | £900+ per linear metre | Bespoke veneers, integrated blinds, Rw 48+ |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Demountable solid — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Single-glazed — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Double-glazed acoustic — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Executive timber — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Manifestation — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Integrated blinds — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Door sets — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Fire-stopping — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Camden and Islington split the estate. King's Cross Central Masterplan provides framework-level planning for the majority of the estate, with Argent managing design-code compliance. Listed buildings (Granary, Coal Drops, Fish & Coal Building) restrict external alteration.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Office Partitioning in trophy hq buildings (20,000–40,000 sqft plates) is typically specified to demountable solid level — plasterboard face, steel studwork, rw 42–48. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in argent-designed grade a (pancras square 2–6) is typically specified to single-glazed frameless level — 10–12mm glass, minimal frame, rw 35–42. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in converted victorian industrial (granary, stanley building, fish & coal building) is typically specified to double-glazed acoustic level — 10+12mm glass, cavity, rw 45–52. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in mixed-use with ground-floor retail/f&b is typically specified to executive timber + glazed level — bespoke veneers, integrated blinds, rw 48+. Programme is governed by loading access and estate working-hours framework.
Partition installation is commonly delivered as night-shift work in occupied offices — off-site fabrication reduces on-site time to under 2 hours per metre installed. Dust barriers, HEPA vacuum and scent-neutral silicones are standard.
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
All King's Cross occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in King's Cross see Office Maintenance in King's Cross or Commercial Maintenance in King's Cross.
Anonymised project outlines from our King's Cross and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 12 rooms
Budget band · £180k
Programme · 3 weeks
Double-glazed acoustic, integrated blinds, manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 8 pods
Budget band · £95k
Programme · 2 weeks
Frameless glazed with branded manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 offices
Budget band · £125k
Programme · 2 weeks
Timber and glazed hybrid with integrated AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — off-site fabrication means each linear metre installs in under 2 hours, so a typical meeting-room suite is completed over 2–3 night shifts.
Single-glazed Rw 35–42; double-glazed Rw 45–52; solid demountable Rw 42–48; bespoke systems Rw 55+. Independent Part E test reports on request.
Yes — EI30 and EI60 glazed fire screens are available where compartmentation requires them, with FIRAS-certified installation.
Demountable systems are specifically designed for reconfiguration without damaging ceiling, floor or walls. Typical reconfigure time is 1–2 days per meeting room.
Yes — we hold Argent-specific contractor approval with CSCS, insurance, CDM and the estate's fit-out protocol sign-off.
Yes — approved for CAT B alterations, reactive works and dilapidations across occupied tenant floors on the estate. NDA and enhanced vetting (BPSS) for team members working in these buildings.
Yes — specialist handling of exposed brick, original cast iron, timber floors, and reversible fit-out on listed Granary, Fish & Coal and Stanley Building elements.
Argent Pancras Square Grade A CAT B: £130–£200 per sqft. Trophy HQ level: £250+ per sqft. Heritage industrial: £150–£250 per sqft reflecting specialist handling.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
Whole-building decorating for commercial occupiers. Night and weekend delivery.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.