Office Fit-Out delivered in London Bridge, London SE1
London Bridge · Office Fit-Out

Office Fit-Out in London Bridge

Office Fit-Out across London Bridge (SE1). Office fit-out delivery for new lease take-ups, HQ relocations, floor consolidations and landlord CAT A works. Programme-driven, with a single fixed-price contract spanning design, build, M&E and handover.

Estate-approvedCDM 2015FIRASNICEIC£10M insured

Office Fit-Out in London Bridge — what businesses typically need

Office Fit-Out across London Bridge (SE1) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to The Shard, The News Building, More London Place 1–6, Blue Fin Building, Palestra among others. Teams mobilise from our London operations base, with direct transport links via London Bridge (Northern, Jubilee + National Rail + Thameslink), Borough (Northern), Bermondsey (Jubilee), Waterloo (Bakerloo, Jubilee, Northern, Waterloo & City + National Rail). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.

The London Bridge market is dominated by professional services (big four, pwc, ey), legal (norton rose fulbright, kirkland & ellis), consulting (accenture, deloitte digital), each with distinct office fit-out requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office fit-out in trophy buildings including The Shard, The News Building, More London Place 1–6, Blue Fin Building.

SE1 spans the Shard (professional services, consulting, hospitality HQ), the More London estate (Ernst & Young, PwC, Norton Rose Fulbright), Bankside (Blue Fin, Palestra, government departments) and emerging Borough Market / Bermondsey Street (media, tech, design).

Our commercial delivery model

Southwark permits 08:00–18:00 Mon–Fri and 08:00–13:00 Sat for noisy works. The Shard imposes additional lift-booking windows and out-of-hours work restrictions on occupied floors. The Shard service yard accommodates large-scale fit-out but bookings are tight — typical lead time 5 days. More London service road operates 24/7 but with estate-management permits. Bankside benefits from wider loading flexibility.

  1. Stage 1

    Brief capture and space test-fit in 10 working days

  2. Stage 2

    Fixed CAT B design package — Stage 3 drawings, M&E schedules

  3. Stage 3

    Principal contractor appointment, CDM 2015 notification to HSE

  4. Stage 4

    Weekly client reports with photos and programme RAG status

  5. Stage 5

    Commissioning, O&M issue and 12-month defects period

Programme, budget, and disruption

TierRangeWhat's covered
CAT A£60–£95 per sqftBase-build finish to let-ready standard
CAT A plus£95–£140 per sqftCAT A with added meeting rooms, kitchen, furniture-ready finishes
CAT B standard£120–£200 per sqftFull occupier fit-out with partitioning, joinery, M&E
CAT B premium / HQ£220–£380 per sqftBespoke design, high-spec finishes, AV, branded reception

This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.

Typical works we deliver in London Bridge

CAT A — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

CAT A plus — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

CAT B standard — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

CAT B premium — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

Test-fit — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

Space plan — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

Demountable partitioning — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

Acoustic glazing — delivered in London Bridge under estate-approved loading and out-of-hours protocols.

Planning and compliance for Office Fit-Out in London Bridge

Southwark Council holds planning authority. Conservation areas at Borough, Bermondsey Street, Bankside, and riverside. London Bridge Character Area adds further overlay. Strategic views protect the Shard backdrop.

Service-specific compliance

CDM 2015 principal contractorFIRAS-certified fire-stoppingNICEIC electrical certificationPart B, Part E, Part M Building RegulationsBS 5266 emergency lightingF-Gas handling for any HVAC alterationsWELL/BREEAM input where required£10M PL + £10M PI insurance

Buildings we have worked in across London Bridge

Notable buildings

  • The Shard
  • The News Building
  • More London Place 1–6
  • Blue Fin Building
  • Palestra
  • 240 Blackfriars Road
  • The Place (Bankside)
  • One Tower Bridge
  • Bankside 1/2/3
  • Hay's Galleria
  • 20 Fenchurch Street (edge)

Notable estates

  • More London Estate (St Martins)
  • Shard Quarter (Sellar Property Group)
  • Bankside Yards (Native Land)

Reference list available on request under NDA.

Our process — seven stages

  1. Survey

    Measured condition survey within 5 working days, including M&E, fabric and compliance review.

  2. Brief

    Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.

  3. Design

    Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.

  4. Fixed quote

    Lump-sum price against the design package. All prelims transparent.

  5. Mobilisation

    CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.

  6. Delivery

    Weekly client reports with photos, programme RAG, variation log, compliance status.

  7. Handover

    O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.

Office Fit-Out specifications by building type

Trophy towers (Shard, News Building — 10,000–20,000 sqft plates)

Office Fit-Out in trophy towers (shard, news building — 10,000–20,000 sqft plates) is typically specified to cat a level — base-build finish to let-ready standard. Programme is governed by loading access and estate working-hours framework.

More London estate Grade A (15,000–25,000 sqft plates)

Office Fit-Out in more london estate grade a (15,000–25,000 sqft plates) is typically specified to cat a plus level — cat a with added meeting rooms, kitchen, furniture-ready finishes. Programme is governed by loading access and estate working-hours framework.

Bankside modern stock (8,000–15,000 sqft plates)

Office Fit-Out in bankside modern stock (8,000–15,000 sqft plates) is typically specified to cat b standard level — full occupier fit-out with partitioning, joinery, m&e. Programme is governed by loading access and estate working-hours framework.

Converted period stock (Borough, Bermondsey)

Office Fit-Out in converted period stock (borough, bermondsey) is typically specified to cat b premium / hq level — bespoke design, high-spec finishes, av, branded reception. Programme is governed by loading access and estate working-hours framework.

Out-of-hours, weekend, and live-environment working

CAT B fit-out is typically delivered during standard working hours from a vacant demise. Where we take possession of an occupied floor for phased works, we operate night and weekend shifts with sealed segregation, low-noise equipment and managed loading slots booked with the managing agent.

Southwark permits 08:00–18:00 Mon–Fri and 08:00–13:00 Sat for noisy works. The Shard imposes additional lift-booking windows and out-of-hours work restrictions on occupied floors. The Shard service yard accommodates large-scale fit-out but bookings are tight — typical lead time 5 days. More London service road operates 24/7 but with estate-management permits. Bankside benefits from wider loading flexibility.

Planned preventative maintenance (PPM)

All London Bridge occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in London Bridge see Office Maintenance in London Bridge or Commercial Maintenance in London Bridge.

Case studies

Anonymised project outlines from our London Bridge and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.

Law firm CAT B relocation

Scope · 14,500 sqft

Budget band · £2.3M

Programme · 16 weeks

Full CAT B including client suite, library, mediation rooms

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Venture capital HQ

Scope · 6,200 sqft

Budget band · £1.1M

Programme · 12 weeks

Premium finish, bespoke joinery, boardroom AV containment

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Fintech consolidation fit-out

Scope · 9,800 sqft

Budget band · £1.4M

Programme · 13 weeks

Open plan, acoustic pods, 12 meeting rooms, town hall space

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

FAQs — Office Fit-Out in London Bridge

What is the difference between CAT A, CAT A plus and CAT B?

CAT A is the landlord's base-build finish: raised floors, suspended ceilings, perimeter heating/cooling and emergency lighting. CAT A plus adds meeting rooms, kitchen, and sometimes furniture to let to occupiers immediately. CAT B is the tenant's full occupational fit-out: partitioning, branding, joinery, AV and finishes.

How quickly can you mobilise a fit-out?

For a standard CAT B of 5,000–15,000 sqft we can mobilise within 3–4 weeks of instruction, subject to licence-to-alter. A full CAT B programme typically runs 10–16 weeks.

Do you self-deliver M&E or subcontract it?

We self-deliver electrical and small-works mechanical through our in-house team, with specialist subcontractors on chillers, VRF and BMS. All works are covered by the main contract.

Can you handle BREEAM or WELL certification input?

Yes — we work with the project assessor, supply tracked submittals for materials, air-quality data for paints and adhesives, and commissioning reports for M&E.

Will you manage the licence-to-alter with our landlord?

Yes. We prepare the drawings, M&E schedules, method statements and condition schedule required by the landlord's surveyor, and manage the approval process to completion.

How do you price — per sqft or open-book?

Fixed lump-sum against an agreed specification. Variations are priced per item before issue. No percentage preliminaries markups.

Do you work in the Shard?

Yes — we are approved with Shard Quarter / Sellar for CAT B fit-out and reactive repairs. Lift and service-yard bookings made via Shard tenant services.

How does More London estate approval work?

More London (St Martins) operates a vetted contractor scheme with annual compliance renewal — CSCS, insurance, CDM, and estate-specific induction. We hold up-to-date approvals.

Is Bankside quicker to deliver than More London?

Yes — Bankside has wider loading access and less restrictive out-of-hours protocols. Typical CAT B fit-out runs 10–15% faster than the equivalent on More London or in the Shard.

What's typical CAT B cost in SE1?

Standard CAT B: £110–£170 per sqft. Shard and More London: £140–£220 per sqft due to loading and OoH premium. Bankside: £100–£150 per sqft for mid-tier stock.

Related services in London Bridge

Related insights

In-depth articles on commercial fit-out, compliance and market strategy.

Start with a survey in London Bridge

Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.