Office Partitioning across London Bridge (SE1). Office partitioning — demountable, acoustic, full-height glazed and solid-core systems. Installed under occupancy or during refurbishment, with Part E acoustic compliance and FIRAS fire-stopping certification.
Office Partitioning across London Bridge (SE1) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to The Shard, The News Building, More London Place 1–6, Blue Fin Building, Palestra among others. Teams mobilise from our London operations base, with direct transport links via London Bridge (Northern, Jubilee + National Rail + Thameslink), Borough (Northern), Bermondsey (Jubilee), Waterloo (Bakerloo, Jubilee, Northern, Waterloo & City + National Rail). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The London Bridge market is dominated by professional services (big four, pwc, ey), legal (norton rose fulbright, kirkland & ellis), consulting (accenture, deloitte digital), each with distinct office partitioning requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office partitioning in trophy buildings including The Shard, The News Building, More London Place 1–6, Blue Fin Building.
SE1 spans the Shard (professional services, consulting, hospitality HQ), the More London estate (Ernst & Young, PwC, Norton Rose Fulbright), Bankside (Blue Fin, Palestra, government departments) and emerging Borough Market / Bermondsey Street (media, tech, design).
Southwark permits 08:00–18:00 Mon–Fri and 08:00–13:00 Sat for noisy works. The Shard imposes additional lift-booking windows and out-of-hours work restrictions on occupied floors. The Shard service yard accommodates large-scale fit-out but bookings are tight — typical lead time 5 days. More London service road operates 24/7 but with estate-management permits. Bankside benefits from wider loading flexibility.
Site survey and dimensional check — 48 hours
Partition and glazing specification with acoustic Rw rating
Off-site fabrication to reduce on-site dust and time
Night or weekend installation for occupied floors
Part E acoustic test report on request
| Tier | Range | What's covered |
|---|---|---|
| Demountable solid | £140–£240 per linear metre | Plasterboard face, steel studwork, Rw 42–48 |
| Single-glazed frameless | £380–£550 per linear metre | 10–12mm glass, minimal frame, Rw 35–42 |
| Double-glazed acoustic | £650–£900 per linear metre | 10+12mm glass, cavity, Rw 45–52 |
| Executive timber + glazed | £900+ per linear metre | Bespoke veneers, integrated blinds, Rw 48+ |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Demountable solid — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Single-glazed — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Double-glazed acoustic — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Executive timber — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Manifestation — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Integrated blinds — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Door sets — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Fire-stopping — delivered in London Bridge under estate-approved loading and out-of-hours protocols.
Southwark Council holds planning authority. Conservation areas at Borough, Bermondsey Street, Bankside, and riverside. London Bridge Character Area adds further overlay. Strategic views protect the Shard backdrop.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Office Partitioning in trophy towers (shard, news building — 10,000–20,000 sqft plates) is typically specified to demountable solid level — plasterboard face, steel studwork, rw 42–48. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in more london estate grade a (15,000–25,000 sqft plates) is typically specified to single-glazed frameless level — 10–12mm glass, minimal frame, rw 35–42. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in bankside modern stock (8,000–15,000 sqft plates) is typically specified to double-glazed acoustic level — 10+12mm glass, cavity, rw 45–52. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in converted period stock (borough, bermondsey) is typically specified to executive timber + glazed level — bespoke veneers, integrated blinds, rw 48+. Programme is governed by loading access and estate working-hours framework.
Partition installation is commonly delivered as night-shift work in occupied offices — off-site fabrication reduces on-site time to under 2 hours per metre installed. Dust barriers, HEPA vacuum and scent-neutral silicones are standard.
Southwark permits 08:00–18:00 Mon–Fri and 08:00–13:00 Sat for noisy works. The Shard imposes additional lift-booking windows and out-of-hours work restrictions on occupied floors. The Shard service yard accommodates large-scale fit-out but bookings are tight — typical lead time 5 days. More London service road operates 24/7 but with estate-management permits. Bankside benefits from wider loading flexibility.
All London Bridge occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in London Bridge see Office Maintenance in London Bridge or Commercial Maintenance in London Bridge.
Anonymised project outlines from our London Bridge and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 12 rooms
Budget band · £180k
Programme · 3 weeks
Double-glazed acoustic, integrated blinds, manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 8 pods
Budget band · £95k
Programme · 2 weeks
Frameless glazed with branded manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 offices
Budget band · £125k
Programme · 2 weeks
Timber and glazed hybrid with integrated AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — off-site fabrication means each linear metre installs in under 2 hours, so a typical meeting-room suite is completed over 2–3 night shifts.
Single-glazed Rw 35–42; double-glazed Rw 45–52; solid demountable Rw 42–48; bespoke systems Rw 55+. Independent Part E test reports on request.
Yes — EI30 and EI60 glazed fire screens are available where compartmentation requires them, with FIRAS-certified installation.
Demountable systems are specifically designed for reconfiguration without damaging ceiling, floor or walls. Typical reconfigure time is 1–2 days per meeting room.
Yes — we are approved with Shard Quarter / Sellar for CAT B fit-out and reactive repairs. Lift and service-yard bookings made via Shard tenant services.
More London (St Martins) operates a vetted contractor scheme with annual compliance renewal — CSCS, insurance, CDM, and estate-specific induction. We hold up-to-date approvals.
Yes — Bankside has wider loading access and less restrictive out-of-hours protocols. Typical CAT B fit-out runs 10–15% faster than the equivalent on More London or in the Shard.
Standard CAT B: £110–£170 per sqft. Shard and More London: £140–£220 per sqft due to loading and OoH premium. Bankside: £100–£150 per sqft for mid-tier stock.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
Whole-building decorating for commercial occupiers. Night and weekend delivery.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.