Commercial Kitchens & Tea Points delivered in Hammersmith, London W6
Hammersmith · Commercial Kitchens & Tea Points

Commercial Kitchens & Tea Points in Hammersmith

Commercial Kitchens & Tea Points across Hammersmith (W6). Office kitchens and tea points — from single-point boiling-water taps through to full staff kitchens with commercial appliances, coffee stations and dishwashing. Delivered with joinery, M&E and ventilation under one contract.

Estate-approvedCDM 2015FIRASNICEIC£10M insured

Commercial Kitchens & Tea Points in Hammersmith — what businesses typically need

Commercial Kitchens & Tea Points across Hammersmith (W6) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark, Landmark House among others. Teams mobilise from our London operations base, with direct transport links via Hammersmith (Piccadilly, District, Circle, Hammersmith & City), Barons Court (Piccadilly, District), Ravenscourt Park (District), Goldhawk Road (Hammersmith & City). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.

The Hammersmith market is dominated by media and advertising (disney, sony, virgin), consumer brand hq (l'oréal, coca-cola), retail hq (sports direct), each with distinct commercial kitchens & tea points requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered commercial kitchens & tea points in trophy buildings including 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark.

Hammersmith commercial stock centres on Hammersmith Broadway and the Thames riverside. Occupiers are dominated by media/advertising (Disney, Sony, Virgin, Coca-Cola), retail HQ (L'Oréal, Sports Direct), and consumer-brand HQ. Floor plates are typically 8,000–20,000 sqft.

Our commercial delivery model

LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.

  1. Stage 1

    Site survey including drainage, water, power, extract

  2. Stage 2

    Space plan with headcount-based appliance specification

  3. Stage 3

    Joinery design in Corian, solid surface or stone

  4. Stage 4

    Appliance specification (Miele, Quooker, Franke, coffee)

  5. Stage 5

    Installation with M&E connection and commissioning

Programme, budget, and disruption

TierRangeWhat's covered
Tea point standard£120–£220 per sqftSmall joinery run, boiling water tap, fridge, dishwasher
Kitchenette£180–£320 per sqftFull counter, sink, appliances, storage, small cooking
Staff kitchen£280–£480 per sqftFull kitchen with commercial appliances, extract, food storage
Executive / concierge£480+ per sqftDesigner joinery, stone tops, concierge coffee, bespoke

This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.

Typical works we deliver in Hammersmith

Tea point — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Kitchenette — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Staff kitchen — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Executive kitchen — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Boiling water tap — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Ice-maker — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Dishwasher — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Fridge/freezer — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.

Planning and compliance for Commercial Kitchens & Tea Points in Hammersmith

Hammersmith & Fulham Council holds planning. Hammersmith Broadway Conservation Area and Hammersmith Odeon (Grade II* listed) restrict external works. Riverside properties engage Thames policy constraints.

Service-specific compliance

Water Regulations (WRAS)Part G water efficiencyPart F ventilation (if cooking)Gas Safe (if gas installed)BS 6173 gas installationF-Gas where refrigeration installed£10M PL + £10M PI

Buildings we have worked in across Hammersmith

Notable buildings

  • 3 Shortlands
  • One Lyric Square
  • 245 Hammersmith Road
  • The Ark
  • Landmark House
  • 1 Hammersmith Broadway
  • Building 10 (Hammersmith Grove)
  • 4 Hammersmith Grove
  • Centro Building
  • Wombat's
  • Hammersmith Bridge Road

Notable estates

  • Hammersmith Island commercial core
  • Hammersmith Grove development
  • Fulham Reach (edge)

Reference list available on request under NDA.

Our process — seven stages

  1. Survey

    Measured condition survey within 5 working days, including M&E, fabric and compliance review.

  2. Brief

    Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.

  3. Design

    Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.

  4. Fixed quote

    Lump-sum price against the design package. All prelims transparent.

  5. Mobilisation

    CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.

  6. Delivery

    Weekly client reports with photos, programme RAG, variation log, compliance status.

  7. Handover

    O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.

Commercial Kitchens & Tea Points specifications by building type

Modern Grade A (8,000–20,000 sqft plates)

Commercial Kitchens & Tea Points in modern grade a (8,000–20,000 sqft plates) is typically specified to tea point standard level — small joinery run, boiling water tap, fridge, dishwasher. Programme is governed by loading access and estate working-hours framework.

1990s/2000s commercial stock (refurb candidates)

Commercial Kitchens & Tea Points in 1990s/2000s commercial stock (refurb candidates) is typically specified to kitchenette level — full counter, sink, appliances, storage, small cooking. Programme is governed by loading access and estate working-hours framework.

Riverside trophy stock

Commercial Kitchens & Tea Points in riverside trophy stock is typically specified to staff kitchen level — full kitchen with commercial appliances, extract, food storage. Programme is governed by loading access and estate working-hours framework.

Mixed-use with ground-floor retail

Commercial Kitchens & Tea Points in mixed-use with ground-floor retail is typically specified to executive / concierge level — designer joinery, stone tops, concierge coffee, bespoke. Programme is governed by loading access and estate working-hours framework.

Out-of-hours, weekend, and live-environment working

Kitchen installation in occupied offices is typically phased overnight — joinery is fabricated off-site and installed in 2–3 nights, with M&E connection and commissioning on the final shift.

LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.

Planned preventative maintenance (PPM)

All Hammersmith occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Hammersmith see Office Maintenance in Hammersmith or Commercial Maintenance in Hammersmith.

Case studies

Anonymised project outlines from our Hammersmith and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.

Law firm staff kitchen

Scope · Full kitchen

Budget band · £180k

Programme · 4 weeks

Corian tops, Miele appliances, concierge coffee station

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Tech HQ tea points

Scope · 6 tea points

Budget band · £220k

Programme · 5 weeks

Matched joinery across floors with Quooker, fridges, dishwashers

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Financial services executive kitchen

Scope · 2 kitchens

Budget band · £320k

Programme · 6 weeks

Stone tops, bespoke joinery, wine fridge, coffee machine

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

FAQs — Commercial Kitchens & Tea Points in Hammersmith

Can you install Quooker or Zip HydroTap?

Yes — both systems are standard in office tea point fit-out. We install Quooker Flex, Pro3, Cube, and Zip HydroTap Celsius/Classic/Arc per client preference.

Do you handle commercial kitchen extraction?

Yes — compliant DW172 extract canopies with fire suppression, grease filtration and roof-level terminal. Part F ventilation sign-off and F-Gas certification where refrigeration is added.

Can you match existing office joinery finishes?

Yes — we colour and veneer match to existing reception or meeting-room joinery for design continuity. Sample boards provided.

Is Hammersmith cheaper for fit-out than City or Canary Wharf?

Yes — typically 15–25% cheaper per sqft due to wider loading access, fewer out-of-hours restrictions, and lower management-overhead. Standard CAT B: £100–£150 per sqft.

Do you work in the consumer-brand HQ buildings?

Yes — L'Oréal, Disney, Sony and other Hammersmith-cluster HQs hold our compliance pack on file. Standard BPSS vetting for media-brand secure zones.

What's typical programme in Hammersmith?

10,000 sqft CAT B: 9–12 weeks. 20,000 sqft: 14–18 weeks. Generally 1–2 weeks faster than equivalent on a central-London estate due to loading flexibility.

Can you handle riverside trophy stock?

Yes — including Thames-side access logistics, riverside glazing considerations and flood-risk compliant M&E routing.

Related services in Hammersmith

Related insights

In-depth articles on commercial fit-out, compliance and market strategy.

Start with a survey in Hammersmith

Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.