Commercial Kitchens & Tea Points across Hammersmith (W6). Office kitchens and tea points — from single-point boiling-water taps through to full staff kitchens with commercial appliances, coffee stations and dishwashing. Delivered with joinery, M&E and ventilation under one contract.
Commercial Kitchens & Tea Points across Hammersmith (W6) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark, Landmark House among others. Teams mobilise from our London operations base, with direct transport links via Hammersmith (Piccadilly, District, Circle, Hammersmith & City), Barons Court (Piccadilly, District), Ravenscourt Park (District), Goldhawk Road (Hammersmith & City). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Hammersmith market is dominated by media and advertising (disney, sony, virgin), consumer brand hq (l'oréal, coca-cola), retail hq (sports direct), each with distinct commercial kitchens & tea points requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered commercial kitchens & tea points in trophy buildings including 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark.
Hammersmith commercial stock centres on Hammersmith Broadway and the Thames riverside. Occupiers are dominated by media/advertising (Disney, Sony, Virgin, Coca-Cola), retail HQ (L'Oréal, Sports Direct), and consumer-brand HQ. Floor plates are typically 8,000–20,000 sqft.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
Site survey including drainage, water, power, extract
Space plan with headcount-based appliance specification
Joinery design in Corian, solid surface or stone
Appliance specification (Miele, Quooker, Franke, coffee)
Installation with M&E connection and commissioning
| Tier | Range | What's covered |
|---|---|---|
| Tea point standard | £120–£220 per sqft | Small joinery run, boiling water tap, fridge, dishwasher |
| Kitchenette | £180–£320 per sqft | Full counter, sink, appliances, storage, small cooking |
| Staff kitchen | £280–£480 per sqft | Full kitchen with commercial appliances, extract, food storage |
| Executive / concierge | £480+ per sqft | Designer joinery, stone tops, concierge coffee, bespoke |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Tea point — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Kitchenette — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Staff kitchen — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Executive kitchen — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Boiling water tap — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Ice-maker — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Dishwasher — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Fridge/freezer — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Hammersmith & Fulham Council holds planning. Hammersmith Broadway Conservation Area and Hammersmith Odeon (Grade II* listed) restrict external works. Riverside properties engage Thames policy constraints.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Commercial Kitchens & Tea Points in modern grade a (8,000–20,000 sqft plates) is typically specified to tea point standard level — small joinery run, boiling water tap, fridge, dishwasher. Programme is governed by loading access and estate working-hours framework.
Commercial Kitchens & Tea Points in 1990s/2000s commercial stock (refurb candidates) is typically specified to kitchenette level — full counter, sink, appliances, storage, small cooking. Programme is governed by loading access and estate working-hours framework.
Commercial Kitchens & Tea Points in riverside trophy stock is typically specified to staff kitchen level — full kitchen with commercial appliances, extract, food storage. Programme is governed by loading access and estate working-hours framework.
Commercial Kitchens & Tea Points in mixed-use with ground-floor retail is typically specified to executive / concierge level — designer joinery, stone tops, concierge coffee, bespoke. Programme is governed by loading access and estate working-hours framework.
Kitchen installation in occupied offices is typically phased overnight — joinery is fabricated off-site and installed in 2–3 nights, with M&E connection and commissioning on the final shift.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
All Hammersmith occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Hammersmith see Office Maintenance in Hammersmith or Commercial Maintenance in Hammersmith.
Anonymised project outlines from our Hammersmith and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · Full kitchen
Budget band · £180k
Programme · 4 weeks
Corian tops, Miele appliances, concierge coffee station
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6 tea points
Budget band · £220k
Programme · 5 weeks
Matched joinery across floors with Quooker, fridges, dishwashers
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 2 kitchens
Budget band · £320k
Programme · 6 weeks
Stone tops, bespoke joinery, wine fridge, coffee machine
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — both systems are standard in office tea point fit-out. We install Quooker Flex, Pro3, Cube, and Zip HydroTap Celsius/Classic/Arc per client preference.
Yes — compliant DW172 extract canopies with fire suppression, grease filtration and roof-level terminal. Part F ventilation sign-off and F-Gas certification where refrigeration is added.
Yes — we colour and veneer match to existing reception or meeting-room joinery for design continuity. Sample boards provided.
Yes — typically 15–25% cheaper per sqft due to wider loading access, fewer out-of-hours restrictions, and lower management-overhead. Standard CAT B: £100–£150 per sqft.
Yes — L'Oréal, Disney, Sony and other Hammersmith-cluster HQs hold our compliance pack on file. Standard BPSS vetting for media-brand secure zones.
10,000 sqft CAT B: 9–12 weeks. 20,000 sqft: 14–18 weeks. Generally 1–2 weeks faster than equivalent on a central-London estate due to loading flexibility.
Yes — including Thames-side access logistics, riverside glazing considerations and flood-risk compliant M&E routing.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Branded reception areas — joinery, signage, lighting, AV containment.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.