Office Partitioning across Hammersmith (W6). Office partitioning — demountable, acoustic, full-height glazed and solid-core systems. Installed under occupancy or during refurbishment, with Part E acoustic compliance and FIRAS fire-stopping certification.
Office Partitioning across Hammersmith (W6) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark, Landmark House among others. Teams mobilise from our London operations base, with direct transport links via Hammersmith (Piccadilly, District, Circle, Hammersmith & City), Barons Court (Piccadilly, District), Ravenscourt Park (District), Goldhawk Road (Hammersmith & City). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Hammersmith market is dominated by media and advertising (disney, sony, virgin), consumer brand hq (l'oréal, coca-cola), retail hq (sports direct), each with distinct office partitioning requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered office partitioning in trophy buildings including 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark.
Hammersmith commercial stock centres on Hammersmith Broadway and the Thames riverside. Occupiers are dominated by media/advertising (Disney, Sony, Virgin, Coca-Cola), retail HQ (L'Oréal, Sports Direct), and consumer-brand HQ. Floor plates are typically 8,000–20,000 sqft.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
Site survey and dimensional check — 48 hours
Partition and glazing specification with acoustic Rw rating
Off-site fabrication to reduce on-site dust and time
Night or weekend installation for occupied floors
Part E acoustic test report on request
| Tier | Range | What's covered |
|---|---|---|
| Demountable solid | £140–£240 per linear metre | Plasterboard face, steel studwork, Rw 42–48 |
| Single-glazed frameless | £380–£550 per linear metre | 10–12mm glass, minimal frame, Rw 35–42 |
| Double-glazed acoustic | £650–£900 per linear metre | 10+12mm glass, cavity, Rw 45–52 |
| Executive timber + glazed | £900+ per linear metre | Bespoke veneers, integrated blinds, Rw 48+ |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Demountable solid — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Single-glazed — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Double-glazed acoustic — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Executive timber — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Manifestation — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Integrated blinds — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Door sets — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Fire-stopping — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Hammersmith & Fulham Council holds planning. Hammersmith Broadway Conservation Area and Hammersmith Odeon (Grade II* listed) restrict external works. Riverside properties engage Thames policy constraints.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Office Partitioning in modern grade a (8,000–20,000 sqft plates) is typically specified to demountable solid level — plasterboard face, steel studwork, rw 42–48. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in 1990s/2000s commercial stock (refurb candidates) is typically specified to single-glazed frameless level — 10–12mm glass, minimal frame, rw 35–42. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in riverside trophy stock is typically specified to double-glazed acoustic level — 10+12mm glass, cavity, rw 45–52. Programme is governed by loading access and estate working-hours framework.
Office Partitioning in mixed-use with ground-floor retail is typically specified to executive timber + glazed level — bespoke veneers, integrated blinds, rw 48+. Programme is governed by loading access and estate working-hours framework.
Partition installation is commonly delivered as night-shift work in occupied offices — off-site fabrication reduces on-site time to under 2 hours per metre installed. Dust barriers, HEPA vacuum and scent-neutral silicones are standard.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
All Hammersmith occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Hammersmith see Office Maintenance in Hammersmith or Commercial Maintenance in Hammersmith.
Anonymised project outlines from our Hammersmith and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 12 rooms
Budget band · £180k
Programme · 3 weeks
Double-glazed acoustic, integrated blinds, manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 8 pods
Budget band · £95k
Programme · 2 weeks
Frameless glazed with branded manifestation
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 offices
Budget band · £125k
Programme · 2 weeks
Timber and glazed hybrid with integrated AV containment
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Yes — off-site fabrication means each linear metre installs in under 2 hours, so a typical meeting-room suite is completed over 2–3 night shifts.
Single-glazed Rw 35–42; double-glazed Rw 45–52; solid demountable Rw 42–48; bespoke systems Rw 55+. Independent Part E test reports on request.
Yes — EI30 and EI60 glazed fire screens are available where compartmentation requires them, with FIRAS-certified installation.
Demountable systems are specifically designed for reconfiguration without damaging ceiling, floor or walls. Typical reconfigure time is 1–2 days per meeting room.
Yes — typically 15–25% cheaper per sqft due to wider loading access, fewer out-of-hours restrictions, and lower management-overhead. Standard CAT B: £100–£150 per sqft.
Yes — L'Oréal, Disney, Sony and other Hammersmith-cluster HQs hold our compliance pack on file. Standard BPSS vetting for media-brand secure zones.
10,000 sqft CAT B: 9–12 weeks. 20,000 sqft: 14–18 weeks. Generally 1–2 weeks faster than equivalent on a central-London estate due to loading flexibility.
Yes — including Thames-side access logistics, riverside glazing considerations and flood-risk compliant M&E routing.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
Suspended ceiling grids, tiles, rafts, exposed-services finishes.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
Whole-building decorating for commercial occupiers. Night and weekend delivery.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.