Commercial Washrooms across King's Cross (N1C). Commercial washroom refurbishment — cubicles, vanities, sanitaryware, tile, stone and lighting. Delivered to Part M accessibility, BS 6465 sanitary provision, and Water Regulations compliance. Phased delivery keeps washroom capacity available across a floor during works.
Commercial Washrooms across King's Cross (N1C) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square, R7 (Meta) among others. Teams mobilise from our London operations base, with direct transport links via King's Cross St Pancras (Victoria, Piccadilly, Northern, Circle, Metropolitan, Hammersmith & City + National Rail + Eurostar), Farringdon (Elizabeth line — 1 stop), Euston (Victoria, Northern + National Rail). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The King's Cross market is dominated by tech giants (google, meta, deepmind, astrazeneca r&d), media (guardian, universal music, havas), creative (central saint martins, design studios), each with distinct commercial washrooms requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered commercial washrooms in trophy buildings including 6 Pancras Square (Google UK HQ), 1 Triton Square, 10 Brock Street, 2 Kings Cross Square.
King's Cross estate spans from the Regent's Canal to Euston Road, with anchor HQ buildings, Granary Square, Coal Drops Yard retail and the Saint Pancras International corridor. Occupiers are heavily weighted to tech, media, creative industries and education (UAL Central Saint Martins).
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
Existing washroom survey and sanitary provision check
Specification — cubicles, vanities, taps, WC, flooring, wall finishes
Part M compliance review
Strip-out and mechanical/electrical isolation
Installation of cubicles, vanities, sanitaryware
Tile, stone, flooring installation
Commissioning and handover
| Tier | Range | What's covered |
|---|---|---|
| Refresh | £80–£160 per sqft | Paint, new vanity top, new taps, lighting |
| Standard refurb | £160–£280 per sqft | New cubicles, vanities, WC, tile, flooring |
| Premium | £280–£480 per sqft | Stone vanities, designer cubicles, executive finish |
| Trophy / hotel spec | £480+ per sqft | Full stone, bespoke joinery, smart fittings, AV |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Full strip-out — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Cubicle supply — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Vanity fabrication — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Tile installation — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Stone fabrication — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
WC installation — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Urinal installation — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Tap and fitting — delivered in King's Cross under estate-approved loading and out-of-hours protocols.
Camden and Islington split the estate. King's Cross Central Masterplan provides framework-level planning for the majority of the estate, with Argent managing design-code compliance. Listed buildings (Granary, Coal Drops, Fish & Coal Building) restrict external alteration.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Commercial Washrooms in trophy hq buildings (20,000–40,000 sqft plates) is typically specified to refresh level — paint, new vanity top, new taps, lighting. Programme is governed by loading access and estate working-hours framework.
Commercial Washrooms in argent-designed grade a (pancras square 2–6) is typically specified to standard refurb level — new cubicles, vanities, wc, tile, flooring. Programme is governed by loading access and estate working-hours framework.
Commercial Washrooms in converted victorian industrial (granary, stanley building, fish & coal building) is typically specified to premium level — stone vanities, designer cubicles, executive finish. Programme is governed by loading access and estate working-hours framework.
Commercial Washrooms in mixed-use with ground-floor retail/f&b is typically specified to trophy / hotel spec level — full stone, bespoke joinery, smart fittings, av. Programme is governed by loading access and estate working-hours framework.
Washroom refurbishment typically proceeds in vacated zones during standard hours (noise restrictions on tile cutting are tight in London). Where occupancy demands, phased cores are taken offline one at a time with temporary signage and alternative provision.
Argent estate operates tenant-first access hours — construction traffic typically 7am–10am and 4pm–7pm, with heavy-noise works out-of-hours on occupied Pancras Square buildings. Estate service yard under Pancras Square — central booking through Argent tenant services, typical 3-day lead time. Coal Drops Yard and Granary have independent loading windows around retail trading.
All King's Cross occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in King's Cross see Office Maintenance in King's Cross or Commercial Maintenance in King's Cross.
Anonymised project outlines from our King's Cross and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 8 cores
Budget band · £720k
Programme · 12 weeks
Stone vanities, designer cubicles, Part M on every floor
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 cores
Budget band · £240k
Programme · 6 weeks
Premium finish with integrated lighting and smart fittings
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6 cores
Budget band · £380k
Programme · 10 weeks
Phased floor-by-floor keeping single core always live
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
A standard 4-cubicle washroom: 2–3 weeks. A full floor of male/female/accessible cores: 5–8 weeks. Phased across multiple floors: 6–12 weeks to keep capacity.
Yes — we sequence floor-by-floor, taking single cores offline at a time with clear signage to alternative provision. Critical for buildings where BCO minimum sanitary provision must be maintained.
Yes — full BS 8300 / Part M compliant accessible WC layouts with correct door width, transfer space, grab rails, alarm, and emergency egress.
Duravit, Roca, Villeroy & Boch, Geberit and Grohe as standard; premium specifications in Dornbracht, Vola, Axor, Alape; cubicles from Venesta, Thrislington, Bushboard or bespoke joinery.
Yes — we hold Argent-specific contractor approval with CSCS, insurance, CDM and the estate's fit-out protocol sign-off.
Yes — approved for CAT B alterations, reactive works and dilapidations across occupied tenant floors on the estate. NDA and enhanced vetting (BPSS) for team members working in these buildings.
Yes — specialist handling of exposed brick, original cast iron, timber floors, and reversible fit-out on listed Granary, Fish & Coal and Stanley Building elements.
Argent Pancras Square Grade A CAT B: £130–£200 per sqft. Trophy HQ level: £250+ per sqft. Heritage industrial: £150–£250 per sqft reflecting specialist handling.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.