Commercial washroom refurbishment — cubicles, vanities, sanitaryware, tile, stone and lighting. Delivered to Part M accessibility, BS 6465 sanitary provision, and Water Regulations compliance. Phased delivery keeps washroom capacity available across a floor during works.
Existing washroom survey and sanitary provision check
Specification — cubicles, vanities, taps, WC, flooring, wall finishes
Part M compliance review
Strip-out and mechanical/electrical isolation
Installation of cubicles, vanities, sanitaryware
Tile, stone, flooring installation
Commissioning and handover
| Tier | Range | What's covered |
|---|---|---|
| Refresh | £80–£160 per sqft | Paint, new vanity top, new taps, lighting |
| Standard refurb | £160–£280 per sqft | New cubicles, vanities, WC, tile, flooring |
| Premium | £280–£480 per sqft | Stone vanities, designer cubicles, executive finish |
| Trophy / hotel spec | £480+ per sqft | Full stone, bespoke joinery, smart fittings, AV |
Figures are guide ranges — we provide a fixed quote after survey. City and Canary Wharf typically carry a 10–20% premium over outer zones.
Washroom refurbishment typically proceeds in vacated zones during standard hours (noise restrictions on tile cutting are tight in London). Where occupancy demands, phased cores are taken offline one at a time with temporary signage and alternative provision.
Anonymised project outlines — full reference list with contact introductions available on request under NDA.
Scope · 8 cores
Budget band · £720k
Programme · 12 weeks
Stone vanities, designer cubicles, Part M on every floor
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 cores
Budget band · £240k
Programme · 6 weeks
Premium finish with integrated lighting and smart fittings
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6 cores
Budget band · £380k
Programme · 10 weeks
Phased floor-by-floor keeping single core always live
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
A standard 4-cubicle washroom: 2–3 weeks. A full floor of male/female/accessible cores: 5–8 weeks. Phased across multiple floors: 6–12 weeks to keep capacity.
Yes — we sequence floor-by-floor, taking single cores offline at a time with clear signage to alternative provision. Critical for buildings where BCO minimum sanitary provision must be maintained.
Yes — full BS 8300 / Part M compliant accessible WC layouts with correct door width, transfer space, grab rails, alarm, and emergency egress.
Duravit, Roca, Villeroy & Boch, Geberit and Grohe as standard; premium specifications in Dornbracht, Vola, Axor, Alape; cubicles from Venesta, Thrislington, Bushboard or bespoke joinery.
Area hubs with estate approvals, managing-agent compliance packs and loading protocols held on file. Four live now — remaining six launch in coming weeks.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. No open-book markup.