Commercial Washrooms delivered in City of London, London EC1, EC2, EC3, EC4
City of London · Commercial Washrooms

Commercial Washrooms in City of London

Commercial Washrooms across City of London (EC1, EC2, EC3, EC4). Commercial washroom refurbishment — cubicles, vanities, sanitaryware, tile, stone and lighting. Delivered to Part M accessibility, BS 6465 sanitary provision, and Water Regulations compliance. Phased delivery keeps washroom capacity available across a floor during works.

Estate-approvedCDM 2015FIRASNICEIC£10M insured

Commercial Washrooms in City of London — what businesses typically need

Commercial Washrooms across City of London (EC1, EC2, EC3, EC4) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 22 Bishopsgate, The Leadenhall Building, 20 Fenchurch Street (Walkie-Talkie), The Scalpel, 100 Liverpool Street among others. Teams mobilise from our London operations base, with direct transport links via Liverpool Street, Moorgate, Bank, Cannon Street, Fenchurch Street, St Paul's, Aldgate and the new Elizabeth line at Liverpool Street and Farringdon. Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.

The City of London market is dominated by global investment banks and trading houses, top-tier law firms and professional services, insurance and reinsurance (lloyd's market), each with distinct commercial washrooms requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered commercial washrooms in trophy buildings including 22 Bishopsgate, The Leadenhall Building, 20 Fenchurch Street (Walkie-Talkie), The Scalpel.

The Square Mile is London's densest office market — 9m+ sqft of Grade A stock across trophy towers (22 Bishopsgate, Leadenhall Building, Walkie-Talkie, Scalpel) and period blocks around Liverpool Street and Moorgate. Occupiers are dominated by financial services, professional services, insurance and legal, with increasing tech and life-sciences take-up post-2022.

Our commercial delivery model

Standard working hours are 08:00–18:00 Mon–Fri; heavy noise works typically only permitted 08:00–18:00 or out-of-hours by managing-agent agreement. Trophy buildings commonly mandate loading slots booked 72 hours in advance. Loading bays are pre-booked through estate management — Broadgate, Paternoster, Aldgate all operate tight loading windows. Vehicles over 7.5t face restrictions in the City's Ultra Low Emission Zone (ULEZ) and in some streets under the Bank Junction traffic restrictions.

  1. Stage 1

    Existing washroom survey and sanitary provision check

  2. Stage 2

    Specification — cubicles, vanities, taps, WC, flooring, wall finishes

  3. Stage 3

    Part M compliance review

  4. Stage 4

    Strip-out and mechanical/electrical isolation

  5. Stage 5

    Installation of cubicles, vanities, sanitaryware

  6. Stage 6

    Tile, stone, flooring installation

  7. Stage 7

    Commissioning and handover

Programme, budget, and disruption

TierRangeWhat's covered
Refresh£80–£160 per sqftPaint, new vanity top, new taps, lighting
Standard refurb£160–£280 per sqftNew cubicles, vanities, WC, tile, flooring
Premium£280–£480 per sqftStone vanities, designer cubicles, executive finish
Trophy / hotel spec£480+ per sqftFull stone, bespoke joinery, smart fittings, AV

City, Canary Wharf and prime Westminster carry a typical 10–20% premium over outer London zones due to loading restrictions, out-of-hours working and estate-approval overheads. Figures are guide ranges — we provide a fixed quote after survey.

Typical works we deliver in City of London

Full strip-out — delivered in City of London under estate-approved loading and out-of-hours protocols.

Cubicle supply — delivered in City of London under estate-approved loading and out-of-hours protocols.

Vanity fabrication — delivered in City of London under estate-approved loading and out-of-hours protocols.

Tile installation — delivered in City of London under estate-approved loading and out-of-hours protocols.

Stone fabrication — delivered in City of London under estate-approved loading and out-of-hours protocols.

WC installation — delivered in City of London under estate-approved loading and out-of-hours protocols.

Urinal installation — delivered in City of London under estate-approved loading and out-of-hours protocols.

Tap and fitting — delivered in City of London under estate-approved loading and out-of-hours protocols.

Planning and compliance for Commercial Washrooms in City of London

Works in the City engage the City of London Corporation's planning framework and, for listed buildings, Listed Building Consent. Out-of-hours loading is tightly controlled under the Code of Construction Practice. Many buildings carry conservation area or heritage designations requiring specialist finishes and reversible alteration.

Service-specific compliance

Part G water efficiencyPart M accessibilityBS 6465 sanitary provisionWater Regulations (WRAS)L8 Legionella ACOPFIRAS fire-stopping where compartments pierced£10M PL + £10M PI

Buildings we have worked in across City of London

Notable buildings

  • 22 Bishopsgate
  • The Leadenhall Building
  • 20 Fenchurch Street (Walkie-Talkie)
  • The Scalpel
  • 100 Liverpool Street
  • One Angel Court
  • Aldgate Tower
  • Salesforce Tower (Heron Tower)
  • Tower 42
  • Broadgate Tower
  • 1 Finsbury Circus
  • Paternoster Square
  • One New Change
  • Cannon Place

Notable estates

  • Broadgate Estate (British Land / GIC)
  • Paternoster Square (Mitsubishi Estate)
  • Aldgate Place
  • City of London Corporation managed zones
  • Great Portland Estates holdings

Reference list available on request under NDA.

Our process — seven stages

  1. Survey

    Measured condition survey within 5 working days, including M&E, fabric and compliance review.

  2. Brief

    Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.

  3. Design

    Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.

  4. Fixed quote

    Lump-sum price against the design package. All prelims transparent.

  5. Mobilisation

    CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.

  6. Delivery

    Weekly client reports with photos, programme RAG, variation log, compliance status.

  7. Handover

    O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.

Commercial Washrooms specifications by building type

Trophy tower Grade A (25,000+ sqft floor plates)

Commercial Washrooms in trophy tower grade a (25,000+ sqft floor plates) is typically specified to refresh level — paint, new vanity top, new taps, lighting. Programme is governed by loading access and estate working-hours framework.

Period refurbished blocks (5,000–15,000 sqft plates)

Commercial Washrooms in period refurbished blocks (5,000–15,000 sqft plates) is typically specified to standard refurb level — new cubicles, vanities, wc, tile, flooring. Programme is governed by loading access and estate working-hours framework.

Listed buildings in conservation areas (Bank, Guildhall)

Commercial Washrooms in listed buildings in conservation areas (bank, guildhall) is typically specified to premium level — stone vanities, designer cubicles, executive finish. Programme is governed by loading access and estate working-hours framework.

Converted warehouses (Shoreditch edge of EC2)

Commercial Washrooms in converted warehouses (shoreditch edge of ec2) is typically specified to trophy / hotel spec level — full stone, bespoke joinery, smart fittings, av. Programme is governed by loading access and estate working-hours framework.

Out-of-hours, weekend, and live-environment working

Washroom refurbishment typically proceeds in vacated zones during standard hours (noise restrictions on tile cutting are tight in London). Where occupancy demands, phased cores are taken offline one at a time with temporary signage and alternative provision.

Standard working hours are 08:00–18:00 Mon–Fri; heavy noise works typically only permitted 08:00–18:00 or out-of-hours by managing-agent agreement. Trophy buildings commonly mandate loading slots booked 72 hours in advance. Loading bays are pre-booked through estate management — Broadgate, Paternoster, Aldgate all operate tight loading windows. Vehicles over 7.5t face restrictions in the City's Ultra Low Emission Zone (ULEZ) and in some streets under the Bank Junction traffic restrictions.

Planned preventative maintenance (PPM)

All City of London occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in City of London see Office Maintenance in City of London or Commercial Maintenance in City of London.

Case studies

Anonymised project outlines from our City of London and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.

Law firm washroom upgrade

Scope · 8 cores

Budget band · £720k

Programme · 12 weeks

Stone vanities, designer cubicles, Part M on every floor

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Tech HQ executive washrooms

Scope · 4 cores

Budget band · £240k

Programme · 6 weeks

Premium finish with integrated lighting and smart fittings

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Multi-let refresh

Scope · 6 cores

Budget band · £380k

Programme · 10 weeks

Phased floor-by-floor keeping single core always live

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

FAQs — Commercial Washrooms in City of London

How long does a typical washroom refurbishment take?

A standard 4-cubicle washroom: 2–3 weeks. A full floor of male/female/accessible cores: 5–8 weeks. Phased across multiple floors: 6–12 weeks to keep capacity.

Can you keep washroom provision during works?

Yes — we sequence floor-by-floor, taking single cores offline at a time with clear signage to alternative provision. Critical for buildings where BCO minimum sanitary provision must be maintained.

Do you handle Part M accessible WC upgrades?

Yes — full BS 8300 / Part M compliant accessible WC layouts with correct door width, transfer space, grab rails, alarm, and emergency egress.

What fittings brands do you install?

Duravit, Roca, Villeroy & Boch, Geberit and Grohe as standard; premium specifications in Dornbracht, Vola, Axor, Alape; cubicles from Venesta, Thrislington, Bushboard or bespoke joinery.

Do you hold estate approvals for Broadgate, Paternoster and Aldgate?

Yes — we hold up-to-date CSCS, insurance and compliance records on file with all major City estate managers. First mobilisation time from instruction is typically 5 working days.

How do loading restrictions affect programme?

Loading is pre-booked with the estate — for typical CAT B fit-out we request a rolling 72-hour slot allocation. For out-of-hours deliveries (6am–8am, 6pm–10pm) we book 2 weeks ahead.

Can you work around trading hours for investment banks?

Yes. Most works are phased into 6pm–6am night shifts with full dust-sealed segregation, low-noise tools and managed waste removal. Trading floors remain operational throughout.

Do you handle Listed Building Consent for City period buildings?

Yes — our architectural team manages LBC applications and works with the City's conservation officers on reversible fit-out, historic joinery retention and compatible finishes.

What's typical programme for a City CAT B fit-out?

5,000 sqft: 8–10 weeks. 15,000 sqft: 12–16 weeks. 30,000+ sqft: 18–24 weeks phased.

Related services in City of London

Related insights

In-depth articles on commercial fit-out, compliance and market strategy.

Start with a survey in City of London

Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.