Commercial Washrooms across Hammersmith (W6). Commercial washroom refurbishment — cubicles, vanities, sanitaryware, tile, stone and lighting. Delivered to Part M accessibility, BS 6465 sanitary provision, and Water Regulations compliance. Phased delivery keeps washroom capacity available across a floor during works.
Commercial Washrooms across Hammersmith (W6) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark, Landmark House among others. Teams mobilise from our London operations base, with direct transport links via Hammersmith (Piccadilly, District, Circle, Hammersmith & City), Barons Court (Piccadilly, District), Ravenscourt Park (District), Goldhawk Road (Hammersmith & City). Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.
The Hammersmith market is dominated by media and advertising (disney, sony, virgin), consumer brand hq (l'oréal, coca-cola), retail hq (sports direct), each with distinct commercial washrooms requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered commercial washrooms in trophy buildings including 3 Shortlands, One Lyric Square, 245 Hammersmith Road, The Ark.
Hammersmith commercial stock centres on Hammersmith Broadway and the Thames riverside. Occupiers are dominated by media/advertising (Disney, Sony, Virgin, Coca-Cola), retail HQ (L'Oréal, Sports Direct), and consumer-brand HQ. Floor plates are typically 8,000–20,000 sqft.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
Existing washroom survey and sanitary provision check
Specification — cubicles, vanities, taps, WC, flooring, wall finishes
Part M compliance review
Strip-out and mechanical/electrical isolation
Installation of cubicles, vanities, sanitaryware
Tile, stone, flooring installation
Commissioning and handover
| Tier | Range | What's covered |
|---|---|---|
| Refresh | £80–£160 per sqft | Paint, new vanity top, new taps, lighting |
| Standard refurb | £160–£280 per sqft | New cubicles, vanities, WC, tile, flooring |
| Premium | £280–£480 per sqft | Stone vanities, designer cubicles, executive finish |
| Trophy / hotel spec | £480+ per sqft | Full stone, bespoke joinery, smart fittings, AV |
This area sits outside the core trophy-tower premium zone — programme and pricing typically sit at the mid-range of the bands below. Figures are guide ranges — we provide a fixed quote after survey.
Full strip-out — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Cubicle supply — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Vanity fabrication — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Tile installation — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Stone fabrication — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
WC installation — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Urinal installation — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Tap and fitting — delivered in Hammersmith under estate-approved loading and out-of-hours protocols.
Hammersmith & Fulham Council holds planning. Hammersmith Broadway Conservation Area and Hammersmith Odeon (Grade II* listed) restrict external works. Riverside properties engage Thames policy constraints.
Reference list available on request under NDA.
Measured condition survey within 5 working days, including M&E, fabric and compliance review.
Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.
Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.
Lump-sum price against the design package. All prelims transparent.
CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.
Weekly client reports with photos, programme RAG, variation log, compliance status.
O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.
Commercial Washrooms in modern grade a (8,000–20,000 sqft plates) is typically specified to refresh level — paint, new vanity top, new taps, lighting. Programme is governed by loading access and estate working-hours framework.
Commercial Washrooms in 1990s/2000s commercial stock (refurb candidates) is typically specified to standard refurb level — new cubicles, vanities, wc, tile, flooring. Programme is governed by loading access and estate working-hours framework.
Commercial Washrooms in riverside trophy stock is typically specified to premium level — stone vanities, designer cubicles, executive finish. Programme is governed by loading access and estate working-hours framework.
Commercial Washrooms in mixed-use with ground-floor retail is typically specified to trophy / hotel spec level — full stone, bespoke joinery, smart fittings, av. Programme is governed by loading access and estate working-hours framework.
Washroom refurbishment typically proceeds in vacated zones during standard hours (noise restrictions on tile cutting are tight in London). Where occupancy demands, phased cores are taken offline one at a time with temporary signage and alternative provision.
LBHF standard: 08:00–18:00 Mon–Fri, 08:00–13:00 Sat. Less restrictive than City/Canary Wharf — heavy noise typically permitted through full Saturday mornings. Hammersmith Broadway loading bays require TfL parking suspension permits. Riverside properties have independent Thames-side logistics. A4/M4 access makes heavy delivery straightforward.
All Hammersmith occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in Hammersmith see Office Maintenance in Hammersmith or Commercial Maintenance in Hammersmith.
Anonymised project outlines from our Hammersmith and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.
Scope · 8 cores
Budget band · £720k
Programme · 12 weeks
Stone vanities, designer cubicles, Part M on every floor
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 4 cores
Budget band · £240k
Programme · 6 weeks
Premium finish with integrated lighting and smart fittings
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
Scope · 6 cores
Budget band · £380k
Programme · 10 weeks
Phased floor-by-floor keeping single core always live
Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.
A standard 4-cubicle washroom: 2–3 weeks. A full floor of male/female/accessible cores: 5–8 weeks. Phased across multiple floors: 6–12 weeks to keep capacity.
Yes — we sequence floor-by-floor, taking single cores offline at a time with clear signage to alternative provision. Critical for buildings where BCO minimum sanitary provision must be maintained.
Yes — full BS 8300 / Part M compliant accessible WC layouts with correct door width, transfer space, grab rails, alarm, and emergency egress.
Duravit, Roca, Villeroy & Boch, Geberit and Grohe as standard; premium specifications in Dornbracht, Vola, Axor, Alape; cubicles from Venesta, Thrislington, Bushboard or bespoke joinery.
Yes — typically 15–25% cheaper per sqft due to wider loading access, fewer out-of-hours restrictions, and lower management-overhead. Standard CAT B: £100–£150 per sqft.
Yes — L'Oréal, Disney, Sony and other Hammersmith-cluster HQs hold our compliance pack on file. Standard BPSS vetting for media-brand secure zones.
10,000 sqft CAT B: 9–12 weeks. 20,000 sqft: 14–18 weeks. Generally 1–2 weeks faster than equivalent on a central-London estate due to loading flexibility.
Yes — including Thames-side access logistics, riverside glazing considerations and flood-risk compliant M&E routing.
Full commercial refurbishment for occupied and vacant offices — CAT B fit-out, finishes, M&E upgrades.
CAT A and CAT B fit-out for new leases, HQ relocations and floor consolidations.
Renovation of existing office space — modernising finishes, layout and services without full strip-out.
Reactive and planned maintenance (PPM) for commercial offices — single trade or full FM cover.
Carpet tile, LVT, resin, engineered timber. Installed in live environments.
In-depth articles on commercial fit-out, compliance and market strategy.
Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.