Lighting & Electrical delivered in City of London, London EC1, EC2, EC3, EC4
City of London · Lighting & Electrical

Lighting & Electrical in City of London

Lighting & Electrical across City of London (EC1, EC2, EC3, EC4). Commercial lighting and electrical services — LED upgrades, emergency lighting, small power distribution, data containment and BMS interface. NICEIC-certified installation with full EICR reporting.

Estate-approvedCDM 2015FIRASNICEIC£10M insured

Lighting & Electrical in City of London — what businesses typically need

Lighting & Electrical across City of London (EC1, EC2, EC3, EC4) is delivered by our in-house commercial team with current estate approvals and compliance records on file. We have completed works in or adjacent to 22 Bishopsgate, The Leadenhall Building, 20 Fenchurch Street (Walkie-Talkie), The Scalpel, 100 Liverpool Street among others. Teams mobilise from our London operations base, with direct transport links via Liverpool Street, Moorgate, Bank, Cannon Street, Fenchurch Street, St Paul's, Aldgate and the new Elizabeth line at Liverpool Street and Farringdon. Every project is run by a named project manager reporting weekly with photographs and programme RAG. Out-of-hours loading, estate permit-to-work and managing-agent liaison are included in the prelims — not charged as variations.

The City of London market is dominated by global investment banks and trading houses, top-tier law firms and professional services, insurance and reinsurance (lloyd's market), each with distinct lighting & electrical requirements — programme compression, landlord co-ordination, out-of-hours delivery, and full compliance ownership. Our commercial team has delivered lighting & electrical in trophy buildings including 22 Bishopsgate, The Leadenhall Building, 20 Fenchurch Street (Walkie-Talkie), The Scalpel.

The Square Mile is London's densest office market — 9m+ sqft of Grade A stock across trophy towers (22 Bishopsgate, Leadenhall Building, Walkie-Talkie, Scalpel) and period blocks around Liverpool Street and Moorgate. Occupiers are dominated by financial services, professional services, insurance and legal, with increasing tech and life-sciences take-up post-2022.

Our commercial delivery model

Standard working hours are 08:00–18:00 Mon–Fri; heavy noise works typically only permitted 08:00–18:00 or out-of-hours by managing-agent agreement. Trophy buildings commonly mandate loading slots booked 72 hours in advance. Loading bays are pre-booked through estate management — Broadgate, Paternoster, Aldgate all operate tight loading windows. Vehicles over 7.5t face restrictions in the City's Ultra Low Emission Zone (ULEZ) and in some streets under the Bank Junction traffic restrictions.

  1. Stage 1

    Existing system survey and EICR

  2. Stage 2

    Lighting calculation (Relux / Dialux) to BCO/CIBSE standards

  3. Stage 3

    Design package — fittings schedule, small power layout, control strategy

  4. Stage 4

    Installation with NICEIC certification

  5. Stage 5

    Commissioning and EICR sign-off

Programme, budget, and disruption

TierRangeWhat's covered
LED swap-out£12–£22 per sqftLike-for-like LED replacement of existing fluorescent
Full LED scheme£24–£42 per sqftNew fittings, DALI control, emergency compliance
Premium / bespoke£45–£95 per sqftArchitectural lighting, decorative pendants, feature lighting
Full electrical re-wire£45–£85 per sqftDistribution, small power, lighting, controls

City, Canary Wharf and prime Westminster carry a typical 10–20% premium over outer London zones due to loading restrictions, out-of-hours working and estate-approval overheads. Figures are guide ranges — we provide a fixed quote after survey.

Typical works we deliver in City of London

LED upgrade — delivered in City of London under estate-approved loading and out-of-hours protocols.

Full re-wire — delivered in City of London under estate-approved loading and out-of-hours protocols.

Emergency lighting — delivered in City of London under estate-approved loading and out-of-hours protocols.

DALI controls — delivered in City of London under estate-approved loading and out-of-hours protocols.

Wireless lighting — delivered in City of London under estate-approved loading and out-of-hours protocols.

Containment — delivered in City of London under estate-approved loading and out-of-hours protocols.

Small power — delivered in City of London under estate-approved loading and out-of-hours protocols.

Data cabling — delivered in City of London under estate-approved loading and out-of-hours protocols.

Planning and compliance for Lighting & Electrical in City of London

Works in the City engage the City of London Corporation's planning framework and, for listed buildings, Listed Building Consent. Out-of-hours loading is tightly controlled under the Code of Construction Practice. Many buildings carry conservation area or heritage designations requiring specialist finishes and reversible alteration.

Service-specific compliance

NICEIC Approved ContractorBS 7671 (18th edition)BS 5266 emergency lightingPart L energy performancePart M accessibilityCDM 2015 principal contractor£10M PL + £10M PI

Buildings we have worked in across City of London

Notable buildings

  • 22 Bishopsgate
  • The Leadenhall Building
  • 20 Fenchurch Street (Walkie-Talkie)
  • The Scalpel
  • 100 Liverpool Street
  • One Angel Court
  • Aldgate Tower
  • Salesforce Tower (Heron Tower)
  • Tower 42
  • Broadgate Tower
  • 1 Finsbury Circus
  • Paternoster Square
  • One New Change
  • Cannon Place

Notable estates

  • Broadgate Estate (British Land / GIC)
  • Paternoster Square (Mitsubishi Estate)
  • Aldgate Place
  • City of London Corporation managed zones
  • Great Portland Estates holdings

Reference list available on request under NDA.

Our process — seven stages

  1. Survey

    Measured condition survey within 5 working days, including M&E, fabric and compliance review.

  2. Brief

    Scope capture workshop with stakeholders — occupier, landlord, managing agent, FM team.

  3. Design

    Stage 3 design package with space plan, M&E schedules, specification and CAT A/B split.

  4. Fixed quote

    Lump-sum price against the design package. All prelims transparent.

  5. Mobilisation

    CDM notification, RAMS, permit-to-work, landlord licence-to-alter, estate approvals.

  6. Delivery

    Weekly client reports with photos, programme RAG, variation log, compliance status.

  7. Handover

    O&M manuals, as-built drawings, building-regs sign-off, 12-month defects period.

Lighting & Electrical specifications by building type

Trophy tower Grade A (25,000+ sqft floor plates)

Lighting & Electrical in trophy tower grade a (25,000+ sqft floor plates) is typically specified to led swap-out level — like-for-like led replacement of existing fluorescent. Programme is governed by loading access and estate working-hours framework.

Period refurbished blocks (5,000–15,000 sqft plates)

Lighting & Electrical in period refurbished blocks (5,000–15,000 sqft plates) is typically specified to full led scheme level — new fittings, dali control, emergency compliance. Programme is governed by loading access and estate working-hours framework.

Listed buildings in conservation areas (Bank, Guildhall)

Lighting & Electrical in listed buildings in conservation areas (bank, guildhall) is typically specified to premium / bespoke level — architectural lighting, decorative pendants, feature lighting. Programme is governed by loading access and estate working-hours framework.

Converted warehouses (Shoreditch edge of EC2)

Lighting & Electrical in converted warehouses (shoreditch edge of ec2) is typically specified to full electrical re-wire level — distribution, small power, lighting, controls. Programme is governed by loading access and estate working-hours framework.

Out-of-hours, weekend, and live-environment working

Live-environment electrical works proceed under permit-to-work with trading-floor isolation slots booked with the occupier and managing agent. Main tests and commissioning typically require overnight isolation; final certification is issued within 24 hours.

Standard working hours are 08:00–18:00 Mon–Fri; heavy noise works typically only permitted 08:00–18:00 or out-of-hours by managing-agent agreement. Trophy buildings commonly mandate loading slots booked 72 hours in advance. Loading bays are pre-booked through estate management — Broadgate, Paternoster, Aldgate all operate tight loading windows. Vehicles over 7.5t face restrictions in the City's Ultra Low Emission Zone (ULEZ) and in some streets under the Bank Junction traffic restrictions.

Planned preventative maintenance (PPM)

All City of London occupiers benefit from a PPM framework covering L8 water hygiene, EICR, emergency lighting, F-Gas registers and fabric maintenance. For a scoped PPM package in City of London see Office Maintenance in City of London or Commercial Maintenance in City of London.

Case studies

Anonymised project outlines from our City of London and adjacent-area portfolio — full reference list with contact introductions available on request under NDA.

Investment bank LED upgrade

Scope · 28,000 sqft

Budget band · £480k

Programme · 8 weeks nights

Full LED with DALI, 12-year ROI on Cat B wiring

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Tech HQ lighting scheme

Scope · 9,200 sqft

Budget band · £260k

Programme · 5 weeks

Architectural lighting with Casambi wireless

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

Law firm emergency lighting compliance

Scope · 15,000 sqft

Budget band · £85k

Programme · 3 weeks

BS 5266 upgrade across 4 floors

Delivered under single-contractor D&B with CDM 2015 principal contractor duty. Full compliance pack at handover.

FAQs — Lighting & Electrical in City of London

Can you deliver an LED upgrade without a full re-wire?

Yes — LED swap-out using existing circuits is common where the existing wiring is sound (post-EICR). Typical ROI on energy savings is 2–4 years.

Do you handle DALI and wireless lighting controls?

Yes — we install Tridonic, Lutron, Casambi and Helvar systems, with commissioning and training for the FM team.

Will an LED upgrade help with MEES compliance?

Yes — lighting is typically the largest single electrical load in an office. An LED upgrade with controls can lift an EPC from D/E into B/C territory.

Do you test and certify emergency lighting?

Yes — annual full-duration discharge testing and monthly flick tests are offered under a PPM contract. Certificates to BS 5266 provided.

Do you hold estate approvals for Broadgate, Paternoster and Aldgate?

Yes — we hold up-to-date CSCS, insurance and compliance records on file with all major City estate managers. First mobilisation time from instruction is typically 5 working days.

How do loading restrictions affect programme?

Loading is pre-booked with the estate — for typical CAT B fit-out we request a rolling 72-hour slot allocation. For out-of-hours deliveries (6am–8am, 6pm–10pm) we book 2 weeks ahead.

Can you work around trading hours for investment banks?

Yes. Most works are phased into 6pm–6am night shifts with full dust-sealed segregation, low-noise tools and managed waste removal. Trading floors remain operational throughout.

Do you handle Listed Building Consent for City period buildings?

Yes — our architectural team manages LBC applications and works with the City's conservation officers on reversible fit-out, historic joinery retention and compatible finishes.

What's typical programme for a City CAT B fit-out?

5,000 sqft: 8–10 weeks. 15,000 sqft: 12–16 weeks. 30,000+ sqft: 18–24 weeks phased.

Related services in City of London

Related insights

In-depth articles on commercial fit-out, compliance and market strategy.

Start with a survey in City of London

Measured condition survey within 5 working days. Fixed-price quote within 10. Estate approvals on file.